MPO/MPO-OM3-12F-3.0MM-LSZH-1M
2024-09-04
Packge Method Tie the line into the PE bag, the connector head position down, product labels affixed to the middle of the PE bag. The long side of the label is parallel to the bottom edge of the PE bag, finally put it into the carton.